Commercial solar case studies
Real UK businesses, real results. See how factories, farms, hospitals and offices are cutting their energy bills with solar from Excel Energy, with the system size, yearly output and payback for every project.
Free, no-obligation site survey
Proven on every kind of site
Welcome to Excel Energy's Case Studies page, where we showcase our successful solar energy projects across various industries. Here, you'll find real-world examples of how we've helped businesses achieve their sustainability goals through customised renewable energy solutions.
From large-scale manufacturing facilities to warehouses, factories and farms, our case studies highlight the innovative approaches, cost savings, and long-term benefits that Excel Energy delivers to its clients. Explore these success stories to see how we can help your business transition to clean, reliable energy while reducing costs and environmental impact.
Showing 27 of 27 projects
Pharmaceutical manufacturingBridgend, Wales
QuidelOrtho solar case study: 1.58 MW Commercial Rooftop Solar Installation QuidelOrtho, Bridgend, Wales
A 1.58 MW rooftop system for a pharmaceutical manufacturer, expected to pay back in just 2.8 years.
- System
- 1.58 MW
- Output a year
- 1.41 GWh
- Payback
- 2.8 yrs
ManufacturingLeeds
Unilever solar case study: 350 kWp Commercial Solar PV Installation - Unilever Leeds
350 kWp at the Seacroft aerosol factory: a 3.5-year payback and £1.76m projected net profit over 25 years.
- System
- 350 kWp
- Output a year
- 342 MWh
- Payback
- 3.5 yrs
Food processingBarking, London
Euro Foods Barking solar case study: 480 kWp Commercial Rooftop Solar Installation - Euro Foods Barking, London
480 kWp across a food-processing roof, producing around 456 MWh a year and paying back in 3.9 years.
- System
- 480 kWp
- Output a year
- 456 MWh
- Payback
- 3.9 yrs
HospitalLondon
Royal Marsden Hospital solar case study: 89.64 kWp Commercial Solar PV Installation: Multi-Building Clean Energy Upgrade for Royal Marsden Hospital, London
A multi-building rooftop upgrade for a leading NHS hospital, expected to pay back in 4 years.
- System
- 89.64 kWp
- Output a year
- 80.2 MWh
- Payback
- 4 yrs
Textile industryLondon
Byron & Byron solar case study: 201 kWp Byron & Byron Commercial Solar PV System, London
Chosen for competitive pricing and a detailed design: £629,905 projected net profit over 25 years.
- System
- 201 kWp
- Output a year
- 155 MWh
- Payback
- 5.9 yrs
Precision engineeringHertford
Qualiturn Products solar case study: 153.65 kWp Qualiturn Products Ltd - Sustainable Manufacturing, Hertford
Precision engineers cut their reliance on the grid with a system that pays back in an estimated 3.2 years.
- System
- 153.65 kWp
- Output a year
- 130 MWh
- Payback
- 3.2 yrs
FarmSomerset
Church Farm, Stanton Prior solar case study: 132 kWp Schletter Roof Mounting System for Farms Church Farm, Stanton Prior, Somerset
132 kWp on a Schletter roof-mounting system, paying back in 1.8 years including feed-in tariffs.
- System
- 132 kWp
- Output a year
- 143 MWh
- Payback
- 1.8 yrs*
Health and fitnessPlymouth, Devon
Fort Stamford solar case study: 139.5 kWp Solar Panel Installation at Fort Stamford, Health & Fitness, Plymouth
A 139.5 kWp rooftop system for a busy health and fitness centre, paying back in 4.9 years.
- System
- 139.5 kWp
- Output a year
- 123 MWh
- Payback
- 4.9 yrs
LeisureShoreham-by-Sea
Sussex Yacht Club solar case study: 27.72 kWp Solar Installation: Sussex Yacht Club, Shoreham-by-Sea
A fully optimised 27.72 kWp system paying back in 3.3 years for a harbourside club.
- System
- 27.72 kWp
- Output a year
- 31.5 MWh
- Payback
- 3.3 yrs
Student accommodationOxford
Osney Power Station solar case study: 73.14 kWp Roof mounting Solar PV Installation: Osney Power Station, Oxford
73.14 kWp on a former power station, now student accommodation, with a 3.1-year payback.
- System
- 73.14 kWp
- Output a year
- 64.1 MWh
- Payback
- 3.1 yrs
QuarryingSouth Wales
Bryn Quarry solar case study: 258.8 kWp Commercial Solar PV System at Bryn Quarry, South Wales
A 258.8 kWp rooftop system producing an estimated 221 MWh of clean energy every year.
- System
- 258.8 kWp
- Output a year
- 221 MWh
Care homeBeckenham, London
Beckenham Care Home solar case study: 89.25 kWp Commercial Solar PV Installation For Beckenham Care Home, London
Energy is one of a care home's biggest costs. An 89.25 kWp system now cuts the bill and pays back in about 4 years.
- System
- 89.25 kWp
- Payback
- 4 yrs
FarmBath area
Stowford Manor Farm solar case study: 135 kWp Roof Mounting Solar Panels on Farm Buildings: Stowford Manor Farm Solar Project, Bath
135 kWp across farm buildings and barns, with a 26.5% return on investment.
- System
- 135 kWp
- Output a year
- 131 MWh
- Payback
- 4.9 yrs
Poultry farmSolar + batteryYorkshire
Cramble Cross Farm solar case study: 160 kWp PV & 160 kWh BESS - for Agriculture : Cramble Cross Farm
160 kWp of solar with a 160 kWh battery, protecting a poultry farm from rising energy costs.
- System
- 160 kWp
- Output a year
- 146 MWh
- Payback
- 5.8 yrs
Food processingCwmbran, Wales
Euro Foods Cwmbran solar case study: 91.50 kWp Solar Ground Mount Installation: Euro Foods, Cwambran
A 91.5 kWp ground-mount system on bespoke mounting, designed around the site's operations.
- System
- 91.5 kWp
- Output a year
- 78.5 MWh
- Payback
- 6 yrs
Dairy farmSolar + batteryNuneaton
Castle Farm solar case study: 75 kWp Solar and Battery Storage Installation at Castle Farm, Nuneaton
75 kWp of solar with battery storage for a large dairy farm, paying back in 4.9 years.
- System
- 75 kWp
- Output a year
- 68.6 MWh
- Payback
- 4.9 yrs
Energy technologyLondon
Arc Renewables solar case study: 40 kWp Solar Panel Installation at Arc Renewables, London
A 40 kWp installation expected to pay back in 3 years and return £187,703 net profit over 25 years.
- System
- 40 kWp
- Payback
- 3 yrs
FarmSolar + batteryBuckingham
Glebe Farm solar case study: 42 kWp Solar panel installation UK: Glebe Farm’s renewable energy transformation, Buckingham
A bespoke 42 kWp system with battery controllers, built around a farm's growing energy demand.
- System
- 42 kWp
- Output a year
- 41.1 MWh
- Payback
- 5 yrs
ShopfittingSomerset
Take 3 Ltd solar case study: 31 kWp Solar Energy System Installation at Take 3 Ltd, Somerset
A 31 kWp system for a joinery and shopfitting specialist, paying back in 3.3 years.
- System
- 31 kWp
- Output a year
- 31.6 MWh
- Payback
- 3.3 yrs
Sustainable energyEdinburgh, Scotland
Enviko Energy solar case study: 105 kWp Solar PV Panel Installation for Enviko Energy, Edinburgh, Scotland
A 105 kWp rooftop array that powers a sustainable energy company's commercial property in Edinburgh.
- System
- 105 kWp
Livestock farmSolar + batteryWarwickshire
Church Farm, Oxhill solar case study: 76.38 kWp Advanced K2 Rail Roof Mounting Solar PV System for Church Farm, Oxhill
76.38 kWp with battery storage on a family-run livestock farm, using K2 rail roof mounting.
- System
- 76.38 kWp
- Output a year
- 77.1 MWh
- Payback
- 7.9 yrs
Dairy farmSomerset
Church Farm, Podimore solar case study: 51.70 kWp Solar PV for Farms, Church Farm Slashes Energy Bills, Podimore
51.7 kWp slashing energy bills on a busy Somerset dairy farm, with a 6.2-year payback.
- System
- 51.7 kWp
- Output a year
- 58.7 MWh
- Payback
- 6.2 yrs
Cattle farmSolar + batteryChepstow
Hardwicke Farm solar case study: 30.6 kWp Solar and Battery Storage Powers Cattle Operations At Hardwicke Farm, Chepstow
Solar and battery storage cutting electricity costs for a family-run cattle farm.
- System
- 30.6 kWp
- Output a year
- 31.2 MWh
- Payback
- 6.8 yrs
CharitySolar + EV chargingSutton, London
Charity for Civil Servants solar case study: 18.92 kWp Solar PV & EV Charging Installation: Charity for Civil Servants, Sutton
Solar PV plus EV charging points, cutting running costs and emissions for a charity, with a 4.9-year payback.
- System
- 18.92 kWp
- Output a year
- 15.1 MWh
- Payback
- 4.9 yrs
ManufacturingRadstock, Somerset
Facade Hoists International solar case study: 17.86 kWp Roof Mounting Solar PV System: Facade Hoists International Reduces Carbon Footprint, Radstock
A 17.86 kWp roof-mounted system helping the UK's suspended-access specialist cut its carbon footprint.
- System
- 17.86 kWp
- Output a year
- 15.4 MWh
- Payback
- 5.9 yrs
FarmKent
Lamberhurst Farm solar case study: 14.19 kWh Ground Mounted Solar PV: Lamberhurst Farm, Kent
A ground-mounted system helping a rural Kent site manage fluctuating energy prices.
- System
- 14.19 kWp
- Output a year
- 15.1 MWh
- Payback
- 7.5 yrs
ResidentialSolar + batteryLondon
Deluxe Residential solar case study: 19.32 kWp High-performance battery energy storage system: Devan Patel London’s Case Study
A 19.32 kWp solar and smart-battery system that raises self-consumption and cuts electricity costs.
- System
- 19.32 kWp
No projects match this filter yet. Tell us about your site and we will show you what is possible.
* Payback including feed-in tariff income. Output and payback are the figures stated in each case study.
What our clients say
Nick and his team are simply excellent. They installed our 200kw system on our factory roof without any glitches...a very smooth and professional operation. Reliable. Professional. Fairly priced. You could not ask for more. These guys have sorted our solar system to perfection. Highly recommended.
Excel Energy Ltd, A great installation from the products used the effective fitting of PV Panels and provision of scaffolding, the team lead by Nick and Bled were efficient and tidy with the whole operation and cleared the site with out any disruption or mess, the system its self is working to maximum effect and performing as per design, I can thoroughly recommend Excel Energy , Shoreham by sea
Great team to work with. We had issues getting approval from national grid on our system Excel Energy kept me informed through the process. When we had approval the installation was carried out in no time.
Ready to cut your energy costs? Get your free site survey.
Tell us about your site and one of our solar experts will call you back with a free, no-obligation assessment: the system we would recommend, what it costs and when it pays for itself.
Get your free quote
Three quick questions about your site, then where to reach you. A solar engineer replies within one working day.